PSS Maint Kits

As with any rubber hose below waterline, the PSS bellows must be inspected on a regular basis for any sign of wear, aging or chemical deterioration. PYI suggests preventative maintenance. The PSS bellow should be replaced in six year intervals. During bellows replacement it is recommended the o-rings & set screws in the stainless steel rotor also be replaced.

Select Your PSS Maintenance Kit:

Want 15% OFF?

Save 15% OFF on any R&D Flexible Coupling when you purchase any PSS Shaft Seal product! Offer not valid with other discounts.

* Valid 2/26/2019 through 5/31/2019